Gonzalez & Jacobson Architecture is preparing the site and foundation for a detached house and pool in Malaga.
Before any work begins, the plot’s conditions must be addressed.
Ground stability or instability can occur for various reasons. These are analysed, and based on the results and conclusions, necessary actions and protocols are established with specific equipment and procedures.
Images show the reinforcement inspection of the capping beam for the perimeter pile wall, which will contain the ground during excavation and serve as the building envelope.
Machinery is also visible, executing capping beam anchors for the pile wall and constructing a riprap wall at the back of the plot to support the lower-level landscaped platform.