{"id":28828,"date":"2023-10-20T17:00:06","date_gmt":"2023-10-20T15:00:06","guid":{"rendered":"https:\/\/gjarquitectura.com\/un-paseo-por-los-avances-de-obra-en-la-costa-del-sol\/"},"modified":"2024-12-03T12:11:11","modified_gmt":"2024-12-03T10:11:11","slug":"a-tour-of-construction-progress-on-the-costa-del-sol","status":"publish","type":"post","link":"https:\/\/gjarquitectura.com\/en\/a-tour-of-construction-progress-on-the-costa-del-sol\/","title":{"rendered":"A Tour of Construction Progress on the Costa del Sol"},"content":{"rendered":"<div class=\"pixfields_box\" >\n\t<ul class=\"pixfields_list\">\n\t\t\t<li class=\"pixfield\">\n\t\t\t<strong>:<\/strong> : \t\t<\/li>\n\t\t<\/ul>\n<\/div>\n<p>Gonzalez &amp; Jacobson Architecture is managing several projects on the Costa del Sol, Malaga, ranging from single-family homes to residential complexes. Each project has its own charm, features, and requirements, and is at a specific stage of the architectural construction process.<\/p>\n<p>Here&#8217;s a look at the construction progress for October:<\/p>\n<p><strong>Execution Phase of 17 Single-Family Homes with Pools in VISTA LAGO Urbanization, El Real de la Quinta, Benahavis (Malaga):<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25367\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-2-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Upon completing the deep foundation micropile execution for one villa, the welder is attaching connectors to the pile caps.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25371\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-4-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25369\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-3-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>After welding the connectors, lost formwork with brickwork is constructed to contain the concrete for the pile caps.<\/p>\n<ul>\n<li><strong>Execution Phase of Three Detached Single-Family Homes with Pools in El Horno de La Miera, Benahavis (Malaga):<\/strong><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25365\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-1-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>One villa is in the foundation concreting phase. After reinforcing the footings for basement walls and pillars, concreting proceeds as inspections are completed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25377\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-7-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>In another villa, where wall reinforcement is already in place, formwork and concreting are underway.<\/p>\n<ul>\n<li><strong>Execution Phase of a Residential Complex with 60 Homes and Pools in &#8220;El Carvajal,&#8221; Fuengirola (Malaga):<\/strong><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25375\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-6-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>The building piloting has been completed, with Block 1 being the last. The excavation for pile caps begins, and piles are being trimmed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-25373\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5.jpg\" alt=\"Avances de obra Octubre. Gonzalez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2023\/10\/Resumen-Obras-Octubre-Gonzalez-Jacobson-Arquitectura-5-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Cleaning concrete is being poured at the bottom of the well. Reinforcement for pile caps in Blocks 2 and 3 is being executed by steel fixers. Only pool piloting remains, as seen in the background of the image, and it is expected to be completed this week.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>: : Gonzalez &amp; Jacobson Architecture is managing several projects on the Costa del Sol, Malaga, ranging from single-family homes<\/p>\n","protected":false},"author":2,"featured_media":25370,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[828,1133,2281,2280,3269],"class_list":["post-28828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","tag-architects-in-malaga","tag-architects-on-the-costa-del-sol","tag-architectural-projects","tag-architecture-and-design","tag-construction-progress"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts\/28828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/comments?post=28828"}],"version-history":[{"count":0,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts\/28828\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/media\/25370"}],"wp:attachment":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/media?parent=28828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/categories?post=28828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/tags?post=28828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}