{"id":29308,"date":"2024-06-21T17:00:48","date_gmt":"2024-06-21T15:00:48","guid":{"rendered":"https:\/\/gjarquitectura.com\/gestionando-la-estabilidad-o-posible-inestabilidad-del-terreno\/"},"modified":"2024-12-13T20:34:36","modified_gmt":"2024-12-13T18:34:36","slug":"managing-ground-stability-or-potential-instability","status":"publish","type":"post","link":"https:\/\/gjarquitectura.com\/en\/managing-ground-stability-or-potential-instability\/","title":{"rendered":"Managing Ground Stability or Potential Instability"},"content":{"rendered":"<div class=\"pixfields_box\" >\n\t<ul class=\"pixfields_list\">\n\t\t\t<li class=\"pixfield\">\n\t\t\t<strong>:<\/strong> : \t\t<\/li>\n\t\t<\/ul>\n<\/div>\n<p>Gonzalez &amp; Jacobson Architecture is preparing the site and foundation for a detached house and pool in Malaga.<\/p>\n<p>Before any work begins, the plot&#8217;s conditions must be addressed.<\/p>\n<p>Ground stability or instability can occur for various reasons. These are analysed, and based on the results and conclusions, necessary actions and protocols are established with specific equipment and procedures.<\/p>\n<p>Images show the reinforcement inspection of the capping beam for the perimeter pile wall, which will contain the ground during excavation and serve as the building envelope.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-26441\" src=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2.jpg\" alt=\"Cimentaci\u00f3n y preparaci\u00f3n del terreno en vivienda unifamiliar en M\u00e1laga. Gonz\u00e1lez &amp; Jacobson Arquitectura\" width=\"1200\" height=\"600\" srcset=\"https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2.jpg 1200w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2-300x150.jpg 300w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2-1024x512.jpg 1024w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2-768x384.jpg 768w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2-1000x500.jpg 1000w, https:\/\/gjarquitectura.com\/wp-content\/uploads\/2024\/05\/Avances-en-Vivienda-unifamiliar-en-Malaga.-Gonzalez-Jacobson-Arquitectura-2-500x250.jpg 500w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>Machinery is also visible, executing capping beam anchors for the pile wall and constructing a riprap wall at the back of the plot to support the lower-level landscaped platform.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>: : Gonzalez &amp; Jacobson Architecture is preparing the site and foundation for a detached house and pool in Malaga.<\/p>\n","protected":false},"author":2,"featured_media":26440,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[907,828,2281,2280,3021,3408,1689,3338],"class_list":["post-29308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","tag-architects","tag-architects-in-malaga","tag-architectural-projects","tag-architecture-and-design","tag-foundation","tag-pool-in-malaga","tag-single-family-home","tag-technical-architect"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts\/29308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/comments?post=29308"}],"version-history":[{"count":0,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/posts\/29308\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/media\/26440"}],"wp:attachment":[{"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/media?parent=29308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/categories?post=29308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gjarquitectura.com\/en\/wp-json\/wp\/v2\/tags?post=29308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}