A Tour of Construction Progress on the Costa del Sol

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura
  • : :

Gonzalez & Jacobson Architecture is managing several projects on the Costa del Sol, Malaga, ranging from single-family homes to residential complexes. Each project has its own charm, features, and requirements, and is at a specific stage of the architectural construction process.

Here’s a look at the construction progress for October:

Execution Phase of 17 Single-Family Homes with Pools in VISTA LAGO Urbanization, El Real de la Quinta, Benahavis (Malaga):

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

Upon completing the deep foundation micropile execution for one villa, the welder is attaching connectors to the pile caps.

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

After welding the connectors, lost formwork with brickwork is constructed to contain the concrete for the pile caps.

  • Execution Phase of Three Detached Single-Family Homes with Pools in El Horno de La Miera, Benahavis (Malaga):

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

One villa is in the foundation concreting phase. After reinforcing the footings for basement walls and pillars, concreting proceeds as inspections are completed.

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

In another villa, where wall reinforcement is already in place, formwork and concreting are underway.

  • Execution Phase of a Residential Complex with 60 Homes and Pools in “El Carvajal,” Fuengirola (Malaga):

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

The building piloting has been completed, with Block 1 being the last. The excavation for pile caps begins, and piles are being trimmed.

Avances de obra Octubre. Gonzalez & Jacobson Arquitectura

Cleaning concrete is being poured at the bottom of the well. Reinforcement for pile caps in Blocks 2 and 3 is being executed by steel fixers. Only pool piloting remains, as seen in the background of the image, and it is expected to be completed this week.

 

 